Technical brief
Dimensions, intended use, loads, quantity and printing needs are defined.
Cardboard boxes are converted from selected corrugated board to a specific construction. Work begins with the product, dimensions, loads and conditions of use rather than one universal board thickness. Cutting, die-cutting, creasing, printing and other operations are performed according to the approved dieline.
Every stage must follow the approved construction and order specification.
Dimensions, intended use, loads, quantity and printing needs are defined.
Dieline, joints, folds, openings and internal elements are selected.
Corrugated board is assessed from product weight, stacking and transport conditions.
Cutting, die-cutting, forming and printing follow the approved specification.
No single parameter can replace the full technical brief.
| Criterion | What is assessed | Effect on solution |
|---|---|---|
| Product | Dimensions, weight and shape | Internal volume and retention |
| Loads | Stacking and storage | Board and structural rigidity |
| Logistics | Transport method and route | Protection, joints and closure |
| Printing | Artwork detail and colours | Technology and surface |
Technical data must be approved before serial production.
Product, use, dimensions, weight and quantity are assessed.
Construction and material specification are prepared or selected.
Dimensions, artwork and production terms are confirmed.
Boxes are manufactured and checked against agreed parameters.
Excess material increases weight and cost but does not automatically guarantee better protection. The whole packaging system determines the result.
These answers help define the requirement and prepare a more accurate quotation.
Boxes are converted from corrugated board selected for the intended use and approved construction.
Standard constructions can be assessed together with custom solutions according to product needs.
Yes. The dieline, dimensions and other technical data must be approved before production.
Printing is planned as part of the production specification and agreed before the order is executed.
Timing depends on construction, material, printing, quantity and production capacity and is stated in the quotation.
Send dimensions, quantity, intended use and printing requirements. We will assess the construction and prepare a quotation.